You do not need planning permission for every job, but you cannot carry out major changes without it. It is granted by the local planning authority (LPA) at your council. Before you start, find out whether your work counts as permitted development or needs an application.
When is permission required?
You will probably need it if you want to build something new, make a major change such as an extension, or change the use of a building — for example turning a house into an office or shop. For such work you apply in advance.
When is it not needed?
Small, standard works often fall under permitted development, which needs no separate permission. But there are limits on size, height and position, and the rules are stricter in protected areas and for listed buildings. Check the limits with your LPA before starting.
Where to apply and how long it takes?
You apply to the LPA through your council. Most applications are decided within 8 weeks. For unusually large or complex projects the limit is 13 weeks. If a decision takes longer, you gain the right to appeal. A granted permission usually lasts 3 years, within which you must begin the work or it lapses.
What happens if you build without permission?
If permission was needed and you did not get it, the council can serve an enforcement notice requiring you to undo the work. Ignoring it is illegal, though you can appeal. A refusal can also be appealed — to the Planning Inspectorate, within a set deadline. Scotland, Wales and Northern Ireland have their own planning systems, so the rules differ there.
What else should you check before starting?
Planning permission is not the only approval. Building regulations are separate: they cover the safety of the structure, wiring, insulation and fire protection, are checked by building control, and are not the same as planning permission. Listed buildings also need listed building consent, and work on a shared wall with a neighbour is governed by the Party Wall Act. Many councils offer paid pre-application advice, which tells you whether you need to apply at all and how likely approval is. If the property is let out or sits in an area with restrictions, check the conditions in advance: redoing what is already built costs far more than agreeing the plan on paper.
Finally, planning and permitted development rules change regularly, and some sites carry individual restrictions set by earlier permissions. So even a familiar extension is worth checking against your own local planning authority's current requirements before you start, rather than relying on what a neighbour did.
Thanks for £1If this information was useful and came in time, press the heart. Payment goes through PayPal, with nothing to choose and nothing to fill in, and it pays for the newsroom.
- Jobs & Business A ‘free office’ in London? Where you are welcome, with Wi-Fi and tea
- Jobs & Business Post Your Ad Free
- Life Russian-language events in London: verified dates to December 2026
- Tax HMRC to issue tax calculations on bank interest from late September: what to check in P800 and PA302
- Money £1 houses and money for moving north: what is actually true
- Immigration UK immigration rules change on 8 October 2026: what is new
- Immigration UK visa waiting times in 2026: the official UKVI timelines and how to get a decision in a day